Public transport center construction project in Yu Jiabao transport hub

Time:2015-03-19 16:39:56  Author:  Click:793

Public transport center construction project in Yu Jiabao transport hub includes transport center management room, frame structure, 1 floor construction with the maximum height less than 6 meters and no underground construction. The contents of the project include construction, weak current engineering, decoration engineering, ventilation, fire-fighting, power supply&transformation, power lighting, entrance-exit connection between transport center and underground transport hub, platform and canopy within the center, asphalt concrete road, landscape and water supply&drainage pipe (the largest water-supply pipe diameter is DN65, while the largest drainage pipe diameter is DN300, and the area of asphalt concrete road os 4766m2) in the bus-waiting square. The bidding price is 12,658,686 RMB with the duration from February 1 to April 30,2015