- Bidding Projects
- Business Trends
Business Trends
CNG plant (CNG parent station) engineering construction in Binhai Port Gulin Industrial Zone
Time:2015-03-19 16:33:06 Author: Click:871
CNG plant (CNG parent station) construction project is located in Binhai Port Gulin Industrial Zone. CNG plant has a daily processing capacity of 300,000m3. The construction area is 5917.54m2, mainly including compressor workshop, instrument room, production auxiliary room, canopy, power transformer room, duty room, and gas-filling island and column, etc, with the largest monomer area of 3277.29m2, the maximum height of 4 floors above the ground, lowest of 1 floor underground and the maximum depth of foundation pit reaching 4.2m. The project includes civil construction (pre-cast pile and main part), decoration engineering, land grading not included in drawing (quotation based on the actual situation), outdoor road protection engineering (with drawing), technological design, water supply&drainage, HVAC, electrical engineering, auto-control, fire-fighting weak current and outdoor engineering (including landscaping, road, craft, fire-fighting, electrical engineering, water supply&drainage and gate of the fence, etc.). The bidding price of this project is 32.1 million RMB with the duration from January 2015 to September 2015.